Just [Collection] Service Equipment
planners and lighting retailers, it is hardly possible as the first stop on light the customer's premises to remain present.
Service Equipment is the magic word ... Tools that facilitate the client to handle the lights.
I offer a telescopic rod to make the safe, simple set of gimbal-mounted lights without a ladder a breeze.
The last operation in the shop is the decoration. Now specifies the operator often hand again to the lights, it sets out the light on goods and decorations.
A surprisingly user-friendly impressed aids in the rush just before the opening, and later during operation.
who provides such a tool to its customers, in proves "think" and can, for example, by applying his contact's positive image transferred to his name, long be remembered.
The three-part telescopic pole made of anodized aluminum pipe was developed from components of the photo studio equipment, so it is also to be robust and professional quality.
When closed only 0.80 m long, so it can hardly be in the way it has to fully extend a length of 2.05 m. This achieves lights up to 4.0 m high.
The head consists of a soft, special heat-resistant rubber (max. 160 ° C), which also makes a light aligning a heated without risk. To paint or protective glasses have to secure " Grip " without damage.
Even when adjusting the emitter can be the effect of the light assess the customer's perspective. Who has experience with such work is at the awkward handling of the ladder and down the high and remember to check.
I provide these useful aids to my customers worldwide renowned textile chains (Hugo Boss etc .)
Saturday, December 20, 2008
Thursday, December 18, 2008
How To Make A Snare To Catch A Coyote
[Hugo Boss flagship store] scanner
a special reference object is the Hugo Flagship - Store Berlin in the Rosenthaler road .
The HUGO designer Volker Kächele designed for the new Shop a model of the inner city, which covers an entire inner wall of the newly opened Shops .
was really spectacular leave the room before installation by the project, this model throughout its size (about 16 x 4m) with a huge "light scanner to exit permanently.
The execution accompanied the architects Tim Hupe
during the technical development we had to take care.
The "generator" should be suitable for continuous use. The "scanner light" should be bluish-white are clear and sharp contrast in store lighting.
Through a sophisticated control technology we provided for smooth, automatic change of direction at the ends of the journey. By track and sliding contacts was moving carriage and the LED spots in Scannerarm powered.
As a publicly accessible area of safety were no risks are taken. The owner has been proven this with a single inspection by TÜV site.
on a mechanical barrier could contribute only minimal force, because the whole area was open and customers. Additional sensors provided for the monitoring of short range (20cm to the moving Scannerarm) and contactless shutdown obstacles.
In the first video I have raised these safety shutdown when shooting for the demonstration purposes.
The safety chain was supplemented by two emergency stop switch.
Overall, they say, is still only close to the limits of the possible task you leave real sense of achievement.
a special reference object is the Hugo Flagship - Store Berlin in the Rosenthaler road .
The HUGO designer Volker Kächele designed for the new Shop a model of the inner city, which covers an entire inner wall of the newly opened Shops .
was really spectacular leave the room before installation by the project, this model throughout its size (about 16 x 4m) with a huge "light scanner to exit permanently.
The execution accompanied the architects Tim Hupe
during the technical development we had to take care.
The "generator" should be suitable for continuous use. The "scanner light" should be bluish-white are clear and sharp contrast in store lighting.
Through a sophisticated control technology we provided for smooth, automatic change of direction at the ends of the journey. By track and sliding contacts was moving carriage and the LED spots in Scannerarm powered.
As a publicly accessible area of safety were no risks are taken. The owner has been proven this with a single inspection by TÜV site.
on a mechanical barrier could contribute only minimal force, because the whole area was open and customers. Additional sensors provided for the monitoring of short range (20cm to the moving Scannerarm) and contactless shutdown obstacles.
In the first video I have raised these safety shutdown when shooting for the demonstration purposes.
The safety chain was supplemented by two emergency stop switch.
Overall, they say, is still only close to the limits of the possible task you leave real sense of achievement.
Dragonball Gt Doujins
[ Engel & Völkers Lounge] special light - Disk
The Engel & Völkers Lounge in Hamburg planned Lightshow large bicolor textile-covered pendant lamps with a diameter of 1.6 m. Classical construction methods proved to be unsuitable for these dimensions, so I went as his own way.
The rest of the lighting (6x circular fluorescent 23W, 12X E27) I placed a self-supporting "circuit board".
All visible exterior surfaces in a lightweight fabric-covered easily modifiable screen modules .
a result, a stable construction, with thin Suspensions , the very acts "floating" and can be easily opened for service and closed.
The Engel & Völkers Lounge in Hamburg planned Lightshow large bicolor textile-covered pendant lamps with a diameter of 1.6 m. Classical construction methods proved to be unsuitable for these dimensions, so I went as his own way.
The rest of the lighting (6x circular fluorescent 23W, 12X E27) I placed a self-supporting "circuit board".
All visible exterior surfaces in a lightweight fabric-covered easily modifiable screen modules .
a result, a stable construction, with thin Suspensions , the very acts "floating" and can be easily opened for service and closed.
Wednesday, December 17, 2008
Date Ice Skating Wear
[A logo] pharmacy signage
A well known Challenge in the store presentation:
"is proven and will work, but everything will seem new"
Developed in cooperation with Walter King was a light advertising, which is markedly different from standard approaches.
passers-by in the mall one ECE center on the road, and visitors of an adjacent medical center to use an escalator that leads down to the Mall .
of the escalator can see the entire rectangular storefront overlook the pharmacy.
But they have already seen exciting pharmacy shop window?
Our implementation ... transparent acrylic is using milling contour engraved and this engraving is powered by LEDs from the holding section at the bottom with a red light. The whole thing in a triangle on a VA mounted disk. A revolving stage with power transfer increases the crystal's Association.
I also build such signs as well as synchronized displays for multiple applications within a store with adjustable timing .
A well known Challenge in the store presentation:
"is proven and will work, but everything will seem new"
Developed in cooperation with Walter King was a light advertising, which is markedly different from standard approaches.
passers-by in the mall one ECE center on the road, and visitors of an adjacent medical center to use an escalator that leads down to the Mall .
of the escalator can see the entire rectangular storefront overlook the pharmacy.
But they have already seen exciting pharmacy shop window?
Our implementation ... transparent acrylic is using milling contour engraved and this engraving is powered by LEDs from the holding section at the bottom with a red light. The whole thing in a triangle on a VA mounted disk. A revolving stage with power transfer increases the crystal's Association.
I also build such signs as well as synchronized displays for multiple applications within a store with adjustable timing .
Sunday, May 18, 2008
Lakornthai.tv On Netflix
References
preliminary design heating and cooling distribution "Flughafen Berlin Schönefeld" with and on behalf of IPRO DRESDEN
implementation planning Heating for the object "Altmarktgalerie Dresden" on behalf of the company building services Wiesenbach
detailed design and construction supervision for the conversion steam / water in the UNI-Leipzig Campus Jahnallee (10 MW) on behalf of SIB Leipzig
About 400 energy passes, over 50 VOR-ORT-BE advice and consultations to KfW funding
investigation of the heat supply in the Siemens-Bosch-GmbH Berlin
development of a mixing tube for emptying of district heating pipes by means of water jet pumps with Stadtwerke Leipzig GmbH
development of a buffer memory system with power control to reduce burner cycling times (F / D program on behalf of the Verbund Gas AG)
development of modules for utilizing waste heat in the boiler foundry Leipzig
development of solutions to Optimization of single-pipe heating for the WBG Espenhain
investigation and development of a rapid test for the WSL Pelle - Leipzig
implementation planning - Construction Management Gymnasium HLS Liebertwolkwitz road 50 2 BA for the Building Department Leipzig
project selection
preliminary design heating and cooling distribution "Flughafen Berlin Schönefeld" with and on behalf of IPRO DRESDEN
implementation planning Heating for the object "Altmarktgalerie Dresden" on behalf of the company building services Wiesenbach
detailed design and construction supervision for the conversion steam / water in the UNI-Leipzig Campus Jahnallee (10 MW) on behalf of SIB Leipzig
About 400 energy passes, over 50 VOR-ORT-BE advice and consultations to KfW funding
investigation of the heat supply in the Siemens-Bosch-GmbH Berlin
development of a mixing tube for emptying of district heating pipes by means of water jet pumps with Stadtwerke Leipzig GmbH
development of a buffer memory system with power control to reduce burner cycling times (F / D program on behalf of the Verbund Gas AG)
development of modules for utilizing waste heat in the boiler foundry Leipzig
development of solutions to Optimization of single-pipe heating for the WBG Espenhain
investigation and development of a rapid test for the WSL Pelle - Leipzig
implementation planning - Construction Management Gymnasium HLS Liebertwolkwitz road 50 2 BA for the Building Department Leipzig
Software "heat demand accounts for the Envelope Method"
planning - construction management for the heating system Foyer House II UNI Leipzig for the State Building Authority Leipzig detailed design - Construction management
energy conversion UNI-Leipzig (9 MW) for the State Building Authority
Leipzig software plausibility of a reduction in power "for Stadtwerke Leipzig GmbH detailed design HLS Gymnasium
Heinrich Strasse 33 Neukieritzsch for the Building Department Leipzig implementation planning district heating system for the VEAG / RAB Indoor pool Leipzig Nord-HLS for construction of a second Sauna BA for the Building Department Leipzig district heating pipe static line "Gabelsbergerstraße 2x DN 65 for the Stadtwerke Leipzig GmbH district heating pipe static line" area relocation B2 2 x DN 500 for the Stadtwerke Leipzig GmbH pipe static heating pipe "connected to district heating MDR" for Stadtwerke Leipzig GmbH Software "Profitability of Ventilation Systems" Network Conversion Leipzig Grünau area G2U1 for Stadtwerke Leipzig GmbH Software "CD ROM design of dark radiation systems for halls and areas for the company Schulte study heat supply JVA Leipzig Stadtwerke Leipzig GmbH pipe static heating pipe "Zwickau road 2x DN 500 for the Stadtwerke Leipzig GmbH swimming pool Leizig North HLS for construction of a sauna for the Building Department Leipzig planning water for the plunge pool of the indoor pool / aqualand University of Leipzig for the State Building Authority Leipzig Pipe stress analysis, investigation to shut-off of the Basic Law in Leipzig Grünau WK 1-3 for the Stadtwerke Leipzig GmbH heating pipe in the UNI-Leipzig 2 x DN 200 for the State Building Authority Leipzig HU construction of energy conversion UNI Leipzig (9 MW) for the State Building Authority Leipzig advice for heat supply in the residential and commercial building Brühl 8 Participation on advice for heat supply in the residential and commercial building Dresdner Str 37 - Neukieritzsch in Meissen construction management central heating swimming pool Leipzig West to the Building Department Leipzig task for district heating for the VEAG study gas lines 8 x DN 800, district 2 x DN 400 in tipping area Spreetal heating pipe "Zwickau road 2x DN 500 for public utility Leipzig GmbH opinion on the plumbing and heating system at the Villa Fritz-Seger-Str. 21 fuel switching heating, WWB Stadtbad Leipzig for the Building Department Leipzig heating system WSV Psychiatry Lumumba Str 15 for the Stadtwerke Leipzig GmbH detailed design HLS Gymnasium Liebertwolkwitz Road 50 for the Building Department Leipzig opinion on the radiant heating in the printing duck Nich study of the local heating at the site Neukieritzsch for VEAG detailed design swimming pool heating system for the Building Department West Leipzig Leipzig renovation of the heating system for kindergarten Diakonia Colditz Schmeink & Cofreth for advice on the heating oil tank farm of the swimming pool cherry hill road Leipzig for the Sports and Recreational Official Leipzig advice to limit the sound level of roof fans for the swimming pool Leipzig Southeast for the Building Department Leipzig district heating system conversion Inner West suburb for Stadtwerke Leipzig GmbH report on thermal insulation K-value measurement Siedlerstraße 3 steam mains replacement ZOO-ring for Stadtwerke Leipzig GmbH Expertise on the drop ceiling of the swimming pool Tarostraße Leipzig for Building Department Leipzig assembly planning HLS TVST hall for DSD AEG Dresden-3000 KW-Aufmaß/K- value measurement / heat demand calculation according to DIN 4701/Optimierung roof insulation district lines with pressure (lower link) for Stadtwerke Leipzig Allkauf Rosa-Luxembourg- Str employees on textbook HVAC requirements in WEKA heating kindergarten for Stadtwerke Leipzig with condensing boiler 60 KW heating office buildings Lauchhammer with 120 KW condensing boilers for the Trust variant analysis / cost compared to the economic heating / ventilation with heat recovery in sports facilities design / costing natural gas / radiant heating for the wagon Niesky (30 MW) study of energy conversion in the bathhouse Leipzig draft planning Technical equipment Sports hall Heinrichstraße Leipzig (Heating, Ventilation me WRG, sanitation, elt) for the Building Department Leipzig draft planning Technical equipment Sports hall Liebertwolkwitz Str Leipzig (Heating, Ventilation me WRG, sanitation) for the Building Department Leipzig optimization of district heating network Wermsdorf (hydraulic, costs ..) for Schmeink & Cofreth Leipzig development of software based on Excel for building equipment and district heating Static calculations district heating Teltow for the company Loeffler draft planning Technical equipment Stadtbad Leipzig (Heating, Ventilation me WRG, sanitation) for the Building Department Leipzig assembly planning for heating sanitary Telecom hall for DSD observations on the heat supply (centralized, decentralized) for housing management Markham on behalf Schmeink & Cofreth Leipzig energy diagnosis Planning for multi-family house Sasstraße in Leipzig for Günter & Son Ltd Central heating for the swimming pool Leipzig Southeast 2 x 400 KW town gas central heating for the swimming pool Leipzig Nord 2 x 400 KW oil central heating for the swimming pool Leipzig Nordost 800 KW district heating renovation of the heating system for the Indoor pool Leipzig Nordost rehabilitation of the heating system and heating system for the school in Leipzig Miltitz 180 KW OIL renovation of the heating fire Miltitz renovation of the heating system in kindergarten Leipzig Zeumerstraße 180 KW district heating renovation of the heating in the children's home Prellerstraße 70 KW town gas rehabilitation of the heating system of the Georg-Schuhmann- Planning a high school in Leipzig Heating pipeline 800 m 2 x DN 200 for the Kirov energy company planning a customer station steam / water 7 MW for the Kirov energy company to slide in just 6 weeks of planning the district heating boiler house with 2 MW of natural gas, heating power, dec. direct consumer stations planning to convert the heat supply of steam to hot water in the Sachsenguß GmbH Leipzig planning for district heating of residential area in Böhlitz-Ehrenberg for the Kirov energy company (about 5 MW) planning the heating-Cossmannsdorf for the company Salzmann (2.5 MW oil ) planning the heating system for the company in the cooling tower Oertli GmbH (250 KW oil) heating system for the planning of the company Videotronik Querfurt (800 KW OIL) Study on the rehabilitation of the 3 MW - heating plant in the seed Aschersleben study for district heating by the government in MIBRAG Breitingen study for district heating in the MIBRAG Stasch wit ... District lines for the Kirov energy company on Sprikkenweg renovation of the heating center office building Sprikkenweg (district heating) for the Kirov energy company site project for a heating container 600 KW OIL for Spefarka GmbH study on the improvement of heat supply in the industrial and social structure GmbH cause investigation and re-planning for a steam line DN 500 for the company Albuschat construction of a central heating system and heating / ventilation for a warehouse / office district heating to 300 KW for the company STUMPF heating system for the malting plant Krostitz study on the improvement of heat supply company Dexion Hall study on the improvement of heat supply in the disk Leipzig plant study on the improvement of heat supply in the board plant Naunhof Planning 3 Location projects for oil-fired heating containers as a temporary solution for heat supply in Leipzig Concrete Union 2 MW, 600 KW, 400 KW) Planning for the rehabilitation of the heat supply in the KAFA GmbH Halle-3.5 MW boiler house, central control of 5 objects with 2 indoor heating dec. Air heating study on the improvement of heat supply in the Chemical Trade Area Headquarters study on the improvement of heat supply in the chemical trade hall seat Cross road planning of an oil-fired heating containers for the Kirov Energy Company (800 KW, OIL) Development of a substation 150 kW for the Kirov energy company planning the substation for the Saxon Armaturenfabrik (1.7 MW) planning the substation for the furniture factory in Leipzig (2MW steam / water) district heating connection for the firm of Breitkopf & Hartel (DN 150) Location Project, including district heating pipes, water, Elt, phone for dieSchwimmhalle / Kindergarten Northeast (1000 KW OIL) Station project, including district heating pipes, water, Elt, phone for the residential area Mockau (400 KW OIL) rehabilitation of district heating stations and heating systems in residential area Schoenefeld Berthold-Brecht-Allee (3x250 KW heating) for the cooperative Leipzig renovation of the heating system with hot water supply for the residential complex Gustav-Adolf-Werk (about 120 units) for the company HZR rehabilitation of office and retail building in Leipzig in the Seeburgstraße 94 (mitFernwärmekompaktstation 180 KW) for the Linos Immobilien GmbH renovation of the heating system in the house Nebelung (100 KW OIL) for the owner Mr. Nebelung site planning for a heating container (1MW OIL) with district heating pipes, water, orld for the hotel on Auewald-Leipzig study on the improvement of heat and hot water supply ASTORIA Hotel Leipzig location for the project at the heating plant heating containers Gohlis Leipzig (2 MW OIL) House Velebil Leipzig, Ortrunweg 17 multiple dwelling Möbius Meissen, Lower St. 3 pairs of house Neumann Leipzig, Aschaffenburg Str 11
Subscribe to:
Posts (Atom)